Masterpile was driven into the ground in this semi industrial location and a small raised above ground wall level left. Ground conditions will dictate whether an impact or vibrator hammer is most suitable and the piling can be driven into the ground to create a water barrier wall to control flooding, as the water table rises, or the nearby river breaches.